Insulation Coordination Lightning protection

برآورد عملكرد صاعقه­ ي پست ناشي از برخورد صاعقه در خطوط هوايي متصل

۱۶ بازديد
دسته بندي مقالات ترجمه شده isi
فرمت فايل doc
حجم فايل 1.069 مگا بايت

پس از پرداخت، لينك دانلود فايل براي شما نشان داده مي شود

پرداخت و دانلود

Substation Lightning Performance Estimation due to Strikes into Connected Overhead Lines

 

Abstract—The generalization of the probabilistic Lightning
Limiting Parameter (LLP) method for high voltage substation
lightning performance estimation due to the discharges into
connected overhead lines (OHL) is described. The method
improvement is made only for the case of lightning strokes to the
shield wire of OHL causing back-flashover in front of the
substation. The improved LLP method is illustrated at the
insulation coordination study of the 400 kV line with long
connecting cable with direct entry into Gas Insulated Substation
(GIS) of hydro-electric plant. The number of surge arrester sets
and sensitivity analyses of number of connected step-up
transformers influence to the Mean Time Between Failures
(MTBF) of the 400 kV transformer and equipment insulation is
investigated

 

برآورد عملكرد صاعقه­ ي پست ناشي از برخورد صاعقه در خطوط هوايي متصل 

 

چكيده

تعميم روش احتمالاتي پارامتر محدودكننده­ي صاعقه (LLP) براي تخمين عملكرد فشار قوي صاعقه در پست ناشي از تخليه بار در خطوط هوايي (OHL) متصل توضيح داده مي­شود. بهبود اين روش تنها در حالت برخورد صاعقه به سيم محافظ OHL ايجاد مي­شود كه باعث قوس برگشتي در مقابل پست مي­شود. روش LLP بهبود يافته در مطالعه­ي هماهنگي عايقي خط 400 كيلوولت با كابل بلند متصل شده با ورودي مستقيم به پست عايق گازي (GIS) در نيروگاه برقآبي نشان داده مي­شود. تاثير تعداد مجموعه برق­گيرها و تحليل حساسيت تعداد ترانسفورماتورهاي افزاينده­ي متصل شده بر ميانگين بين زمان خرابي (MTBF) در ترانسفورماتور 400 كيلوولت و عايق تجهيزات بررسي مي­شوند.

 



پس از پرداخت، لينك دانلود فايل براي شما نشان داده مي شود

پرداخت و دانلود